The Australian Energy Market Operator (AEMO) is formally integrating gas infrastructure planning – including LNG regasification – into its long-term electricity system roadmap. This positions LNG as a flexible, and lower-emission alternative to firm up renewable electricity. LNG supply potential can now directly influence where and how Australia builds new electricity infrastructure, especially gas-fired power generation. Source: AEMO
This report is for subscribers only
Start with a FREE 30-day trial and then save up to 22% with an annual subscription. Get instant access to over 1,700 reports. Cancel anytime.
FREE TRIAL
Already a subscriber ? Log in
FREE TRIAL
Already a subscriber ? Log in











